Skip to content
+852 59949145sales@xycelec.com
Xuyucheng ElectronicsXuyucheng Electronics旭与城电子陶瓷

Send the drawing — let us assess it first

Free manufacturability and budgetary assessment, answered within 24 hours. No spec sheet? A photo is enough.

Inquiry

Request a quote / technical advice

Fields marked * are required. Drawings can follow by email later — leave your contact details for now.

For drawings, email sales@xycelec.com with the subject “Quote + company name”.

WhatsApp Chat

WhatsApp QR code - Xuyucheng Electronics

+852 59949145

Scan the QR code or tap the button to start a chat. We usually reply within minutes during business hours.

Chat on WhatsApp

Contact us directly

  • Phone+86 18205777699
  • WhatsApp+852 59949145
  • Emailsales@xycelec.com
  • Factory addressSpecial Ceramics Industrial Park, Xianghong Industrial Zone, Xinshua County, Loudi, Hunan, China
  • Business hoursMon–Sat 8:30–18:00 (GMT+8)
Office & partner plant locationSpecial Ceramics Industrial Park, Xianghong Industrial Zone, Xinshua County, Loudi, Hunan, China
RFQ Checklist

Six things to include in your RFQ

The more complete the information, the faster and more accurate the quote. No drawing yet? Start with a sample or a sketch.

01

Drawing

PDF, DWG or STEP, with critical dimensions and tolerances marked.

02

Material grade

E.g. 99% alumina or zirconia. Not sure? Describe the operating conditions and we will recommend.

03

Quantity

Sampling quantity and expected volume, so we can quote tiered pricing.

04

Tolerance requirements

Dimensional and geometric tolerances on critical features; non-critical faces can be left open.

05

Surface & post-processing

Roughness, metallisation, glazing, plating or brazing requirements.

06

Lead time & application

Target delivery date and end use, so we can match process and capacity.

A photo of the part or a short note on the operating conditions speeds up the engineering review.

01

Send your requirement

A drawing, a sample photo or a description of the operating conditions — any of the three.

02

Engineering review

Manufacturability and budgetary range within 24 hours.

03

Sampling & validation

Samples in 10–15 days with a dimensional report, shipped for your testing.